DIY Builds
Photo by Dương Nhân Pexels Logo Photo: Dương Nhân

Can a sleepout have a toilet?

For a sleepout to be eligible under the schedule 1 exemption: It must not contain bathroom or kitchen facilities. It can't have a kitchen, but it can have a toilet.

How many square feet is good for a 3-bedroom house?
How many square feet is good for a 3-bedroom house?

The Ideal House Size for You The average 3-bedroom square footage for a home is around 1,300 square feet in the United States. Dec 6, 2021

Read More »
What can I do with scrap plywood?
What can I do with scrap plywood?

One of the most common ways scrap plywood is used is in making wall art. The little pieces are easy to customize to create patterns and glue-ups....

Read More »

Codewords 97: October 2020

From 31 August 2020, a range of new and extended building consent exemptions were added to schedule one of the Building Act, including a range of options for building sleepouts. Several of the new and extended exemptions require the assistance of a Licenced Building Practitioner (LBP) to supervise or carry out the design and construction work, which will allow consenting authorities to focus more on higher risk building work. It is also a great reflection of the expertise that LBPs provide, and will help boost their profile to the public. The exemptions cover a wide range of building projects in both rural and urban areas, and include a number of projects including detached standalone buildings, porches and verandas, carports, and solar panels. This means around 9,000 fewer consents will need to be applied for each year and homeowners will save a combined $18m in costs.

A closer look at sleepouts

One of the new exemptions, where homeowners will more than likely need the help of an expert, is in the construction of a detached, standalone building such as a sleepout. A sleepout is a great way for a homeowner to add a private space for an independent member of the family or to have an extra office now that working from home is more popular than ever. Current building consent exemptions already allow for a sleepout up to 10 square metres to be built without a building consent, but the new exemptions expand this all the way up to 30 square metres if the work is carried out of supervised by an LBP. There is also a separate exemption for 30 metre square sleepouts if they are built from prefabricated or kitset components that have been designed (or had the design reviewed) by a Chartered Professional Engineer (CPEng). Of course, all of these sleepouts must still meet the building code. It’s important to remember that building consent process is only one part of the legal requirements for building a sleepout. All the usual requirements about durability of materials, district planning, location of services and boundary restrictions still apply. This means a sleepout must be at least its own height away from a boundary, which will preclude many suburban homes from building to the maximum 30 square metres without a consent (unless they want it right in the centre of their lawn!).

Sleepouts have minimal facilities

The sleepouts included in this exemption are not designed to be lived in exclusively. The facilities of an existing dwelling (such as potable water) must also be readily available for the use of those staying in the sleepout. A sleepout under this exemption is not a ‘tiny house’ and if a homeowner wants to include toilet or cooking facilities they need to apply for a building consent.

A win for the LBP scheme

Should I use exterior paint on inside of shed?
Should I use exterior paint on inside of shed?

If the shed will be a man cave, she shed, kids' play area, studio or backyard home office it should be painted. The paint will seal the wood and...

Read More »
Does a pole barn slab need footers?
Does a pole barn slab need footers?

Soil is not usually able to resist applied vertical loads through a post alone. Pole barn posts should therefore be set on footings to provide...

Read More »
Can I build my own shed?
Can I build my own shed?

Yes, with the right plans you can build your dream shed.

Learn More »

The sleepout also needs to comply with the Building Code, which is one of the key reasons why we require a competent LBP to carry out or supervise the work. These exemptions put trust in LBPs as competent and professional builders, by allowing them to undertake a wider scope of work without a building consent or council inspections. This in turn adds value to holding an LBP licence, and raises the awareness of the scheme with homeowners.

With rights comes responsibility

This work is not Restricted Building Work (RBW) because a building consent is not required. Therefore you do not have to supply a Record of Work (ROW). You are still professionally accountable for the work however, so it is important to maintain the same standards. The oversight of the Building Practitioners Board (BPB) still applies to these projects, as professional accountability is an important tool to protect consumers from rogue builders and maintain the standards of the scheme. The usual rules around plumbing fittings and wiring still apply too, so plumbing work is not covered by this exemption and any electrical work will need a registered electrician and a certificate of compliance on completion. Fire safety rules also mean the sleepout must have smoke alarms installed. It is important to note that the stormwater runoff from larger sleep outs may be significant, and this will need to be taken into account. As a building professional you may need to highlight some of these issues to the homeowner, as they may have limited knowledge. The BPB has made it clear that they expect LBPs to use their professional judgement when undertaking work, and to bring up issues of non-compliance with the client rather than following their instructions blindly.

Further information

MBIE are continuing to support both industry and the public on these new changes, with fully-updated Schedule 1 guidance available on building.govt.nz(external link). A new digital tool to help homeowners determine whether they need a building consent will also be live from October 2020.

Quiz

What is the 90 day Airbnb rule?
What is the 90 day Airbnb rule?

Short-term rentals are allowed only: If your dwelling is within an acceptable city zone. If you are the primary resident of that dwelling. If you...

Read More »
How can I soundproof my shed cheap?
How can I soundproof my shed cheap?

To do this is very easy. Take your rolls of insulation and tack it to the pre-existing wall. Next, use plasterboard and screw it to the beams of...

Read More »
How do you stop a wooden door from swelling?
How do you stop a wooden door from swelling?

If the swelling is minimal, you'll be able to fix it easily by bringing a heat source close to the surface of the door. Allow the door to dry after...

Read More »
Are shed plans easy to follow?
Are shed plans easy to follow?

These are! They guide you every step of the way to complete your dream shed.

Learn More »
What is bs9999?
What is bs9999?

BS 9999: Code of practice for fire safety in the design, management and use of buildings, provides a best practice framework for fire safety. It is...

Read More »