DIY Builds
Photo: Rafael Gonzales
Again, be sure to conduct an extensive inspection of your concrete slab before you start purchasing materials for a shed to go on top of it. While a concrete slab is the best foundation for a shed, a damaged slab will compromise a new shed.
Tips to Secure your Garden Shed Keep Your Shed Locked. ... Keep Your Shed Structurally Sound. ... Fortify with Plants & Surrounds. ... Add Window...
Read More »
On the shed walls use exterior rated 1/2 inch plywood for a waterproof finished look, and 3/4 inch CDX plywood on the roof for strength.
Read More »
If you’re fortunate enough to have a pre-existing concrete slab in your yard, then you are already halfway to building extremely solid storage shed. Before you get started throwing up a shed on your concrete slab, you’ll need to give it a thorough inspection. You don’t want to start your shed only to find that it isn’t level or is below grade. So how to build a shed on an existing concrete slab? Below we’ll take a look at the challenges of building on a pre-existing concrete slab and detail how to build on top of any type of slab.
160 sqft Unit A 150 sqft home would cover a large three bedroom home, so you'll just need that little bit of extra space to ensure you're fully...
Read More »
To run electricity to a shed or outdoor building, start by planning out the the electrical cable routing. Next, add a GFCI outlet to the home's...
Read More »The same goes for missing rebar or mesh. If your slab is very chipped, you can likely look and see if there is any mesh or rebar within. Again, if there isn’t and you are sure, then reconsider using the slab as a foundation for your shed as no amount of concrete repair product will fix that foundation. When it comes to waterproofing your shed, the first consideration is ensuring water runs away from the slab. If it doesn’t, then that should be your first task. If it is a raised slab but still below grade, then you’ll want to waterproof the sides of the slab. Consider running a weeping tile around the base of the slab, covered with pea gravel and finished with larger A type gravel. Run the tile either to a french drain or towards a lower, drained area. Lastly, your slab may not be level and is sloped. If this is the case, you must level the slab before building. Shimming an entire structure is not advisable, ever, so you’ll have to either find a new foundation for your shed or pour new concrete on top to achieve a level surface. While this is lots more work, it still beats, making an entirely new foundation for a shed.
Soaking seeds before planting helps you to break down the seed's natural defenses against what it expects from Mother Nature, which then allows it...
Read More »
The answer is no, they cannot. They can request additional details which (1) makes things more expensive for you and (2) takes additional time....
Read More »
As long as firewood is left to sit in the right conditions and free from moisture it won't go bad for many years. Once firewood has been seasoned...
Read More »
“Use bars of Irish Spring soap for your deer problem and they'll go away,” Mrs. Poweska advised. “Just use a grater and shave the bars of soap into...
Read More »
Running electricity to a detached garage or shed typically costs between $1,000 and $2,500, depending on electrical needs, distance to your...
Read More »
What handmade wood items sell best? Candle holders. Picture frames. Children's blocks. Birdhouses. Planters. Art. Wood turning. Coffee tables. More...
Read More »