Can I put a mobile home on my property in Georgia?

A manufactured home can also be placed on a site temporarily for six months for residential purposes while a site-built home is constructed. Extensions may be allowed. Manufactured/Mobile Homes are considered personal property and are taxable in the State of Georgia.

How thick should roof plywood be?
How thick should roof plywood be?

What is this? Standard roof sheathing thickness is ½” to ⅝” thick. If you are using OSB for your roof deck, then ⅝” is the recommended thickness....

Read More »
What is the most sold piece of furniture?
What is the most sold piece of furniture?

Pinterest is one has a trend tool that helps you to see what people have been searching for. We have used the data from this tool to see the most...

Read More »

Building Permits And Inspections |Manufactured Home Permit

Types of manufactured homes

According to Georgia State Law, there are two types of mobile homes; manufactured or mobile. manufactured home is built to the Manufactured Home Construction and Safety Standards ( home is built to the Manufactured Home Construction and Safety Standards HUD Code ) and displays a red certification label on the exterior of each transportable section. The HUD Code provides the design and construction requirements for the home, with some modifications permitted for on-site completion. Manufactured homes are built in the controlled environment of a manufacturing plant and are transported in one or more sections on a permanent chassis. A mobile home is a factory-built dwelling built prior to June 15, 1976, to standards other than the HUD Code, (pre-HUD Code Home) that were acceptable under applicable state codes in effect at the time of construction or introduction of the home into the state.

Requirements in Cherokee County

All homes to be installed in Cherokee County must be manufactured homes . Mobile homes installed prior to August 25, 1991 are permitted to remain as legal non-conforming land uses.

Single-wide manufactured homes are permitted only on AG (Agricultural) zoned property.

A building permit is required for the installation of a manufactured home. Cherokee County will verify by review of the survey/plat of the property and on-site inspections that the home is installed in compliance with building codes and zoning regulations. Properties on septic and or well, will require prior Environmental Health Department approvals

Permitting Process

To begin the process for a Manufactured/Mobile Home Permit, please review this guide entirely. For additional questions and information, please call the Development Service Center at 770-721-7810 or email us at [email protected]

The following items are required in order to obtain a permit;

Septic permit –you must apply with the Office of Environmental Health prior to applying with us Approved driveway permit Approved address assigned by GIS Department (for new homes) A Completed Manufactured/Mobile Home Permit Application Proof of ownership - you must present your bill of sale, title, MSO (manufacturer statement of origin) or invoice Proof of water service Permit fees and impact fees House location plan – This could be a survey of your property or a plat. You can obtain a copy (if available) at the office of Deeds and Records. Use the following checklist to ensure site plan is complete. Please see example below, you can draw on a copy of your property survey. Title Scale North Arrow Street Name Propery lines Rights of ways and easements Setbacks from all property lines Location and dimensions of all existing and proposed buildings Location of all decks, porches, retaining walls (in square feet) Driveway location Wetlands, streams or bodies of water Abutting streets and lanes Any buildings to be demolished If applicable; well location and/or septic tank and field line

Do you need planning permission for a pergola?
Do you need planning permission for a pergola?

Unlike an extension or conservatory, when you choose a pergola or patio canopy you don't need to apply for planning permission or adhere to...

Read More »
How can I make money with my garage?
How can I make money with my garage?

Here's a list of 10 ways on how to turn your garage into an income-producing asset to help pay your bills. Rent it out as storage space. Rent it...

Read More »
Are shed plans easy to follow?
Are shed plans easy to follow?

These are! They guide you every step of the way to complete your dream shed.

Learn More »

Fees

Certificate of Occupancy $50.00

Re-inspection fees $25.00 (if applicable)

Impact fees for all new homes $ 2,008.64 (does not apply to change outs) We accept cash, check and credit cards (a 3% convenience fee will apply) All fees are due at time of application.

Inspections

Inspections are required for manufactured/mobile homes. Please visit our CityView Portal and register to schedule your first inspection. a. Your first inspection is to make sure erosion and sediment control is in place. Septic area is identified, property lines are clearly marked b. A Location survey will need to be provided prior to pouring foundation or the rough inspection c. Foundation or Footing Inspection will need to be before pouring concrete. If support pads are used, we will inspect those with the rough. Deck footings must be inspected prior to any concrete being poured. d. Rough Inspection - When a manufactured home is placed on the site, the support system has been installed and tie-downs have been installed and before installation of skirting. c. Final Inspection – Skirting is installed, front and rear porches are complete. Applicant has installed or hooked up to a well or public water system. Inspector will sign off for electrical, plumbing and gas piping. It is the responsibility of the applicant to schedule inspections. A certificate of occupancy will not be issued without an approved final inspection. Manufactured homes need to be installed by a Georgia licensed or registered installer in accordance with the manufacturer’s installation instructions.

Temporary manufactured home permit due to hardship

A manufactured home may be temporarily placed when the applicant can show extreme hardship. Cases of extreme hardship are defined by the Cherokee County Zoning Ordinance Article 7.7.1 · Hardship due to loss of use of a home due to fire, flood, or other damage making it unfit or unsafe to occupy

What lasts longer concrete or asphalt?
What lasts longer concrete or asphalt?

Overall, the difference between asphalt and concrete driveways is that asphalt is less durable than concrete. With proper maintenance, it can last...

Read More »
Can I build a shed next to my Neighbours fence UK?
Can I build a shed next to my Neighbours fence UK?

According to UK shed regulations, you do not need to seek planning permission if your shed is 2.5 metres tall (or less) and sits at least two...

Read More »
Can I build my own shed?
Can I build my own shed?

Yes, with the right plans you can build your dream shed.

Learn More »

· Hardship due to extensive remodeling of a home or building making the structure unsuitable for occupancy · Hardship due to health related problems of a family relative which warrants proximity of that relative to provide daily care All hardship applications will be temporary and effective for 12 months maximum. Extensions may be approved in 12 months increments subject to demonstration of continuing hardship All applications must be supported by affidavits alleging the facts. Medical affidavits must be signed by a physician stating the health problems and the necessity of care and monitoring. · A manufactured home can also be placed on a site temporarily for six months for residential purposes while a site-built home is constructed. Extensions may be allowed.

Mobile Home Taxation

Manufactured/Mobile Homes are considered personal property and are taxable in the State of Georgia. If you are locating a manufactured home in Cherokee County, you must contact the Tax Assessor’s Office and register your home as soon as possible. Each year every manufactured/mobile home owner shall pay all taxes due to the Tax Commissioner’s Office on or before April 1st. All outstanding taxes must be paid, including penalties and interest before a location permit is issued. For more information and applications please contact the Tax Assessor’s Office at 678-493-6128.

Environmental Health 770-479-0444 for septic/well information

Engineering Department 678-493-6066 for new driveway permits

GIS/Mapping 678-493-6050 for obtaining new addresses

Planning & Land Use 678-493-6101 for hardship cases information

Should vapor barrier be to the cold side?
Should vapor barrier be to the cold side?

In order to prevent condensation from forming, a vapor barrier should be placed on the warm side of your insulation to stop warm, moist air from...

Read More »
Which is better 12 or 14 gauge steel?
Which is better 12 or 14 gauge steel?

In the gauge system the higher the number the thinner the steel. As an example, 12 gauge steel is thicker and stronger than 14 gauge steel. Mar 9,...

Read More »
How is wood measured?
How is wood measured?

The board foot is the most common standard used for saw logs and lumber. A board foot contains 144 cubic inches of sawed lumber or the equivalent...

Read More »
Are shed plans easy to follow?
Are shed plans easy to follow?

These are! They guide you every step of the way to complete your dream shed.

Learn More »
How much does a 10x10 concrete patio cost?
How much does a 10x10 concrete patio cost?

To pour a typical 10x10 concrete slab will cost $670 to $930, a 12x12 slab for a patio will cost $796 to $1,476, a 20x24 driveway slab runs between...

Read More »