DIY Builds
Photo: Kristina Paukshtite
The end with the flange or flare should point down and away from the roof. Step Three: Use roofing nails to secure the drip edge. Nail high up on the drip edge so that the shingles will cover the nails. Ideally, you'd nail about every 12 inches, and in no circumstances should you have 16 inches or more between nails.
1] Raising the level of ground is subject to planning permission. 2] There are permitted development rights which enable a maximum patio or deck...
Read More »
If re:felting over existing felt then the total area in question should be primed first to allow the new felt to adhere to the old as this is the...
Read More »
Step Ten: When you reach the roof’s ridge, you need to make yet another cut in your drip edge. Hold the drip edge up to the ridge and make a mark along where the drip edge exceeds the roof. Make a straight cut through the bottom of the drip edge with your tin snips. When you reach the roof’s ridge, you need to make yet another cut in your drip edge. Hold the drip edge up to the ridge and make a mark along where the drip edge exceeds the roof. Make a straight cut through the bottom of the drip edge with your tin snips. Step Eleven: Fold the drip edge to fit over the ridge. Mark the plumb line, or centerline, as in the image below. Cut the topmost part of the drip edge along this line to create a finished look. Place a single nail in the outside piece to hold the drip edge in place. You should always check with your local building code to see if there are any extra rules you are required to follow during drip edge installation.
Any pole building with 12 foot post spacing is going to be the most efficient to build. At the same time, the width of a building affects the price...
Read More »
Do you get all the money when you sell your house? Most of the time, no, you won't end up getting to keep all the money you make from selling your...
Read More »
Even though vinegar is an acid, it breaks down quickly in the soil and, therefore, is not likely to accumulate enough to affect soil pH for more than a few days. Vinegar causes a rapid burn to plant tissue of susceptible species, so unintended injury is quite likely without knowing more information.
If fighting weeds in your garden has you in a pickle, you’ll be interested in a USDA research report about using acetic acid (vinegar) as an herbicide. USDA researchers confirmed that acetic acid is effective at killing some common weed species, including Canada thistle, lamb’s-quarters, giant foxtail, velvetleaf and smooth pigweed. Weeds were hand-sprayed with various solutions of vinegar, uniformly coating the leaves. The researchers found that 5- and 10-percent concentrations killed the weeds during the first two weeks after emergence from the soil. Older plants required higher concentrations of vinegar to kill them. At the higher concentrations, vinegar had an 85- to 100-percent kill rate at all growth stages. However, perennial weeds, such as Canada thistle, were only temporarily knocked back; the roots survived to sprout new shoots. Even though vinegar is an acid, it breaks down quickly in the soil and, therefore, is not likely to accumulate enough to affect soil pH for more than a few days. Vinegar causes a rapid burn to plant tissue of susceptible species, so unintended injury is quite likely without knowing more information. Further studies are needed to know whether other crop plants and ornamentals can tolerate the vinegar. Ordinary household vinegar is about a 5-percent concentration. Stronger solutions that are labeled for use as herbicides are now available from some retailers, you can check the OMRI product database for current products. https://www.omri.org Note that vinegar with acetic acid concentrations greater than 5 percent may be hazardous and should be handled with appropriate precautions. Vinegar solutions of 11-percent or greater strength can cause skin burns and eye injury. Always read and follow all pesticide label directions.
Copper pipes can last anywhere from six months to the life of a building. But PEX tubing, when operating within its pressure and temperature...
Read More »
A standard 24' x 24' barn can be enough to start, but if you expand, you'll need more space. Many of our clients who use their barns strictly as...
Read More »
30 Wood Shed Foundations Shed Size Number of Blocks 12x16 22 12x20 26 12x24 30 16x20 50 — *Piers or foundation may be required by state 4 more rows
Read More »
Good advantages to using a plastic shed base A plastic shed base has a lot going for it. Firstly, it's never going to rot – no matter how long it's...
Read More »