DIY Builds
Photo: Pixabay
It's important to install OSB in the correct direction for safety reasons. The side stamped “This Side Down” is generally the smooth side. When the panel is installed horizontally, the stamped, or smooth side, should always face down. This means the rough side will face up which provides better traction for the worker.
Crawl Space Disadvantages Crawl spaces can be difficult to insulate well. In humid locations poor insulation can lead to mold and rodent issues....
Read More »
Typically, two car garages are 18 feet wide by 20 feet deep. This is just enough to fit two cars in your garage. There are several other common...
Read More »
Design. The 2018 Olympic standards call for a 600-foot-long run, an 18-degree pitch and elliptically-curved walls that are 22 feet high and spaced...
Read More »
Wedge anchors are typically the strongest anchors, but not every application requires a heavy-duty anchor. Some will do just fine with a plastic...
Read More »Rough Side: Always face the rough side up when installing OSB horizontally on a roof or floor. The rough side has better traction which makes walking on the panel safer. Always face the rough side up when installing OSB horizontally on a roof or floor. The rough side has better traction which makes walking on the panel safer. Smooth Side: Always face the smooth side of an OSB panel out when its installed vertically. The smooth side is slick and provides better water protection. It’s easy to determine which side is rough and which is smooth simply by feeling them. But to make it even easier, the smooth side should be stamped with “This Side Down” and information about the panel.
Most people describe the smell of mold as musty, stale, and earthy — somewhat similar the odor of wet socks or decaying wood. Although mold smells...
Read More »
The key to making the exterior attractive is to think of the shed like a little house. A pleasing paint color or wood stain, trim, and windows—and...
Read More »
Cost By Size Size Average Cost Range 800 sq. ft. $80,000 – $160,000 1,000 sq. ft. $100,000 – $200,000 1,200 sq. ft. $120,000 – $240,000 1,500 sq....
Read More »
The bottom layer should be comprised of stone (6” crushed rock) or consider 6” recycled concrete. The ideal thickness of each layer is between 4 to...
Read More »
How to Finish the Top Edge of a Shed Roof For the final row, cut shingles into strips. Ensure strips are wide enough to cover nails. Install your...
Read More »
Here's six techniques to create heat in the absence of electricity or fire: Insulate your body. Insulate your environment. Keep moving. Light a...
Read More »