DIY Builds
Photo by Erik Mclean Pexels Logo Photo: Erik Mclean

How close to property line can I build a shed?

The exact amount a building needs to be set back from the property line will vary from one location to another. However, the required setback on the side is typically between 5 – 10 feet, while the front and back require around 10 – 20 feet at a minimum.

How do you revive neglected compost?
How do you revive neglected compost?

If it is moldy, spread it out in the sun for a week to kill mold spores and let it dry. Compost that is not moldy can be energized by the addition...

Read More »
How many square feet will 20 tons of gravel cover?
How many square feet will 20 tons of gravel cover?

How many square feet will 20 tons of gravel cover:- typically, 20 tons of gravel will cover approximately 2160 square feet or 240 square yards or...

Read More »
Can I build my own shed?
Can I build my own shed?

Yes, with the right plans you can build your dream shed.

Learn More »

Before you begin a project, there are some terms that you should familiarize yourself with.

Property Line

Property lines are simply the legal boundary that separates your land from your neighbors. Property lines could have been determined in a few different ways depending on how your neighborhood was founded. If the area is newer, the developer most likely separated out each plot of land prior to building homes. In older areas, local and state governments likely determined the property lines. Before you build anything on your land, it’s important to learn how to find property lines. This could help you avoid a difficult situation with one of your neighbors.

Setbacks

Setbacks refer to the minimum amount of distance required from a building and other areas on the property. The most common type of setback occurs with the property lines. As mentioned earlier, depending on where you live, there are requirements for how close to the four property lines you can build a structure. These requirements are set by the local or state governments. Setbacks can also be established for how close you can build from a river, sidewalk, highway and floodplain.

No-Build Zone

No-build zones are designated areas of land where no structures can be built. These zones are usually determined by the local government.

Easements

Easements give others the ability to use someone else’s property. These are frequently associated with utility companies, giving them the right to assess or bury cables within your property. Easements like these are frequently written into the deed for the land, but there can also be implied easements, which are not written down. Instead, if two neighbors have been using land in a certain way and a disagreement ever happens, they can use this history as a type of easement.

Right Of Way

Right of way will allow someone else to travel through your property. This can happen if someone needs to use your land to access public land.

What does it mean when your toilet burps?
What does it mean when your toilet burps?

What Causes a Toilet to Gurgle? The strange gurgling noises are the result of negative air pressure in your drain pipes. So, if you hear these...

Read More »
Do metal sheds need a base?
Do metal sheds need a base?

A: All sheds need a substantial base. The base should be solid, square, flat and level to ensure the stability of your shed. We recommend using...

Read More »
Can I build my own shed?
Can I build my own shed?

Yes, with the right plans you can build your dream shed.

Learn More »

What is blue conduit used for?

Blue electrical nonmetal tubing (ENT) is for indoor use only. Some code-compliant PVC fittings can be used with ENT inside walls, floors, some ceilings or encased in concrete. Outdoor flexible nonmetallic tubing is strong, watertight, non-corrosive and weighs less.

Metallic Conduit and Raceway

The two main types of metallic conduit and raceway are rigid and flexible. Rigid conduit offers solid protection. Flexible metal conduit allows for bends and twists without using extra hardware. Prewired conduit, or armored cable, offers an all-in-one solution with the wires already running through it. Metal electrical boxes must be used with metal conduit. Rigid metallic conduit is most often used in commercial applications. It can also be a smart choice for straight runs of wire or cable through an attic, garage, basement or crawlspace. It protects against nicks, cuts and punctures to wiring from accidents or chewing animals.

Examples of rigid metallic raceways are:

Electrical metallic tubing (EMT): Lightweight and easy to install

Intermediate metallic conduit (IMC): Has a thicker, galvanized wall, making it suitable for outdoor applications

Galvanized rigid conduit (GRC), which is thickest and offers the most protection

Flexible metal conduit allows for bends and twists without the use of extra hardware. It allows for turns at corners without using elbow joints. Tip: Running a green grounding wire is recommended when using conduit. However, electrical code may allow the metal conduit itself to serve as grounding conductor.

What can I put over my old concrete patio?
What can I put over my old concrete patio?

Cover an old concrete patio with a wood or composite deck to bring a warm, organic look to the backyard. Build the new deck with wood or composite...

Read More »
Does vinegar destroy black mold?
Does vinegar destroy black mold?

White vinegar is a mildly acidic product that cleans, deodorizes, and disinfects. It can also kill 82% of mold species, including black mold, on...

Read More »
Can I build my own shed?
Can I build my own shed?

Yes, with the right plans you can build your dream shed.

Learn More »
Which is cheaper metal garage or wood garage?
Which is cheaper metal garage or wood garage?

Metal averages $14 a square foot to build, a far lower cost than wood's square foot rates. Cost per square foot varies from one region of the...

Read More »
These are the Best Shed Plans!
These are the Best Shed Plans!

Comprehensive and Intuitive to follow. Build That Shed!

Learn More »
How many bags of concrete do I need for a 4x4 slab?
How many bags of concrete do I need for a 4x4 slab?

How many bags of concrete do I need for a 4×4 slab?”, at 4 inches thick, generally you will need approximately either 12 bags of 60lb or 9 bags of...

Read More »