DIY Builds
Photo by Ksenia Chernaya Pexels Logo Photo: Ksenia Chernaya

How do I build a shed without planning permission?

You do not need planning permission for this type of garage or shed as long as the floor area on its own or in conjunction with any similar structures is limited to 25 square metres. The new garage or shed should not reduce the open space at the back or side of the house to less than 25 square metres.

Do you need a vapor barrier with spray foam insulation?
Do you need a vapor barrier with spray foam insulation?

In houses with spray foam insulation, however, vapor barriers are not necessary. Quality closed cell foam insulation acts as a vapor barrier and...

Read More »
Can you use 2x4 as joists for ground level deck?
Can you use 2x4 as joists for ground level deck?

The short answer is yes. 2x4s can work for deck joists. However, they aren't ideal for spanning long distances without bending or breaking, so you...

Read More »
Can I build my own shed?
Can I build my own shed?

Yes, with the right plans you can build your dream shed.

Learn More »

If you are going to build an extension or make other changes to your house, you may need planning permission from your local authority. The most common reasons for needing planning permission are when you want to: Generally, you do not need planning permission for minor changes to your house. See ‘What changes can I make without planning permission’ below. However, you should check if you need planning permission before you start building. If you do not get planning permission when it is needed, you may have to pay a large fine or even face going to prison. Your local authority can advise you if you have questions. For more information on applying for planning permission and the different types of planning permission, see Planning permission.

What changes can I make without planning permission?

Generally, you will not need planning permission for the following changes to your home.

Extensions smaller than 40 square metres

You can build an extension or conservatory to the rear of your house as long as it: Does not increase the original floor area of the house by more than 40 square metres

Is not higher than the house

The floor area of any extension above ground level must not exceed:

12 square metres for terraced or semi-detached houses

20 square metres for detached houses

Under these rules, the total floor area is:

The floor area of the extension you are now proposing, and

The floor area of any previous extensions including those you previously got planning permission for Also, the extension must not reduce the open space at the back of the house (that is used only by the people who live in the house) to less than 25 square metres.

There are also detailed rules about:

The height of an extension

Where the windows are placed in an extension

How the roof is used

Garages and sheds

You can convert a garage attached to the rear or side of the house to domestic use provided it has a floor area of less than 40 square metres. If you want to convert a garage for business use, see ‘Planning permission for a material change of use' below. You can build a garage or shed at the back or side of a house as long as it: Does not extend out in front of the building line of the house Is 4 metres or lower in height if it has a tiled or slated pitched roof, or three metres in height if it has any other roof type You do not need planning permission for this type of garage or shed as long as the floor area on its own or in conjunction with any similar structures is limited to 25 square metres.

How do you keep a shed warm in the winter?
How do you keep a shed warm in the winter?

How to Heat a Shed Without Electricity: 10 Practical Ideas and... Make Sure It's Well Insulated. Let Some Sunlight In. Build A Solar Window Heater....

Read More »
How do you keep your house from getting mold in the winter?
How do you keep your house from getting mold in the winter?

Six Ways to Prevent Mold and Mildew During Winter Increase Air Circulation and Reduce Humidity. ... Keep an Eye Out for Leaks That Can Let in...

Read More »

The new garage or shed should not reduce the open space at the back or side of the house to less than 25 square metres. Garages or sheds to the side of the house must match the finish of the house. There are certain rules you must follow when building a garage or shed. They must not be:

Lived in

Used for commercial purposes

Used for keeping pigs, poultry, pigeons, ponies or horses

Front porches

You can build a front porch as long as it is 2 square metres in area or smaller, and is more than 2 metres from a public road or footpath. If the porch has a tiled or slated pitched roof, it must not be higher than 4 metres, or 3 metres for any other type of roof.

Capped walls, wooden fences, gates and access

You can build capped walls (made of brick, stone or block), railings and wooden fences up to 1.2 metres in height at the front of the house, or 2 metres at the side or rear of the house. This does include security fences.

You can build gates up to 2 metres high.

You always need planning permission if you want to widen or create new access to a public road.

Central heating systems

You can install a central heating system chimney, boiler house or oil storage tank (up to 3,500 litres capacity).

Gardens and yards

You can alter your garden or yard to include car parking spaces, garden paths, ponds and other items.

Objects on the roof of the house

You can install:

A TV aerial on the roof so long as it is less than 6 metres higher than the roof A satellite dish at the back or side of the house up to 1 metre in diameter, and not higher than the top of the roof You must get full planning permission for a satellite dish on the front of the house. You must only install one satellite dish on your house.

Wind turbines and solar panels

You can install a wind turbine for domestic use as long as:

It is not attached to a structure

It is not more than 13 metres high

It has a rotor diameter of less than 6 metres

There is a clearance of at least 3 metres between the tip of the rotor and the ground

How long will a 12 volt battery run a 1500 watt heater?
How long will a 12 volt battery run a 1500 watt heater?

E (battery pack) = 8 * 12V * 165Ah = ~15800 VAh which is more than the required 14100 VAh. So, such a battery pack can power a 1500W space heater...

Read More »
What is an evac chair?
What is an evac chair?

Evacuation Chairs are specially designed seats into which mobility-impaired people are secured and transported from a building, usually via...

Read More »

You do not need to get planning permission to fit solar panels to the roof of your house. On 7 October 2022, restrictions on the number of rooftop solar panels you could install were removed and you can now cover your whole roof without needing planning permission. You can install freestanding solar panels at your house without needing planning permission as long as:

They are less than 2.5 metres above ground

They don’t cover more than 25 square metres

The private open space to the rear or side of the house is not reduced to less than 25 square metres There are still certain restrictions if your home is a protected structure or in an architectural conservation area. It is important to check with your local authority for full details before making any changes to your house. You can find more information in Doing Work around the House – The Planning Issues (pdf ) published by the Office of the Planning Regulator. Other publications available include A Guide to Planning Permission (pdf) and A Guide to Making a Planning Application (pdf).

Planning permission for a material change of use

If you want to make a “material change” to how you use your land or buildings, you will need planning permission. A material change means a significant change that will have an impact on your neighbours or your local community.

For example, you will need planning permission if you want to:

Convert your garage into a workshop for business use

Open a crèche

Open a bed and breakfast with more than 4 guest bedrooms

You may also need to get planning permission if you are renting your property for short-term lets. There are some exceptions to the requirement for planning permission for a material change of use. For example, you do not need planning permission to change certain vacant commercial properties (including pubs) into homes. These exceptions are set-out in the Planning and Development Regulations 2001 to 2021. How to apply Contact your local authority if you need to apply for planning permission, or you are not sure if you need planning permission. They will be able to advise you on what is required.

Which door are best used for exterior doors?
Which door are best used for exterior doors?

The most common materials for front or exterior doors are steel, fiberglass, and wood. They can all protect your home effectively, but each one...

Read More »
Is it cheaper to install carpet or hardwood floors?
Is it cheaper to install carpet or hardwood floors?

When comparing the cost of installing hardwood floors over carpet, quality hardwood flooring will almost always be a larger investment compared to...

Read More »
Can you build your own foundation?
Can you build your own foundation?

We don't suggest pouring your own foundation. It's expensive, time consuming and can be dangerous for DIYers. This is one project that you should...

Read More »
Can I build my own shed?
Can I build my own shed?

Yes, with the right plans you can build your dream shed.

Learn More »
How do you praise someone professionally?
How do you praise someone professionally?

How to Compliment a Colleague's Skills “You are such an incredible problem-solver.” “I'm so impressed by how you communicate. ... “I don't know...

Read More »