DIY Builds
Photo by Ketut Subiyanto Pexels Logo Photo: Ketut Subiyanto

How long to leave plastic on concrete?

Apply covering only after you have wet your concrete thoroughly. Use heavy items such as bricks or rocks to hold the cover in place. Adding moisture is still really important, so make sure you are removing the cover every day to hose down the concrete slab. You will need to do this every day for 7 days.

Whats the lowest you can set your heat in the winter?
Whats the lowest you can set your heat in the winter?

between 50-55 degrees The winter thermostat setting should at minimum be between 50-55 degrees to keep your appliances and pipes from freezing. The...

Read More »
How high can a shed go without planning permission?
How high can a shed go without planning permission?

If it will be within 2m of the boundary of the house, it must be 2.5m high.

Read More »

Curing concrete is the most important step when pouring concrete for a slab, pavement, road or tunnel. Getting it right is extremely important as any mistakes, big or small, will cost you a lot of money, time and effort, especially when these mistakes can easily be prevented. Curing concrete is the long and crucial hydration process of preventing water evaporating and warmth from escaping from your concrete slab during its drying (strengthening) period. When concrete curing is done properly your concrete slabs will be more durable, strong, resistant to freezing or thawing and abrasion, which will prevent thermal cracks, the development of plastic shrinkage cracks and a worrying amount of loss in strength in the surface layer.

Different Concrete Curing Methods

There are a variety of different ways concrete curing can be performed depending on your site and construction method. The thickness of your concrete slab may also determine which concrete curing method is best. This can be achieved with concrete testing.

There are many different curing method options available such as:

Water Curing

Wet Covering

Formwork Curing

Membrane Curing

Sheet Curing

Curing by Absorbing Heat

Hot mixing method

Electrical curing

Infra-Red Curing

Cover with Sand or Sawdust, Soil, etc

Natural Curing (Exposed concrete)

Concrete Curing: Do’s

Understand that different concrete structures require different curing methods

In commercial driveways, a concrete slab will need to be able to support the constant heavyweight from traffic, trailers and delivery trucks. So the concrete slab will need to be thicker than a residential driveway that only has one family-sized car parking on it. Generally, residential driveways are 6 inches compared to commercial driveways that are 8-10 inches. Lighter traffic areas like pavements only need to support the wheels of bikes instead of cars, so the thickness can be as thin as 4 inches. For thinner slabs such as a floor slab for a new home, water curing (moist curing) is a recommended method, whereas formwork curing is best used for thick concrete where the risk of cracks in concrete surfaces is higher.

DO spray new concrete with water.

Moist curing is a common method of concrete curing. It involves wetting the concrete slab often with water (5-7 times per day) for the first 7 days. This method ensures your concrete slab will be extremely strong and durable, because it allows the moisture to evaporate slowly, preventing cracks and shrinks.

This method is not recommended when the temperature is colder.

What is the fastest growing climber?
What is the fastest growing climber?

Top 10 Fast Growing Climbers : Fallopia (Mile-A-Minute) – Best for Side Walls and Garden Walls. ... Wisteria (Amethyst Falls) – Best Suited for...

Read More »
What happens if you don't connect the earth wire?
What happens if you don't connect the earth wire?

Without the earth wire, if a fault occurs and the live wire becomes loose, there is a danger that it will touch the case. The next person who uses...

Read More »
Can I build my own shed?
Can I build my own shed?

Yes, with the right plans you can build your dream shed.

Learn More »

DO cover new concrete.

If you are busy with other projects and don’t have time to frequently hose down your concrete slab as suggested above, we recommended you cover your slab with plastic sheeting to prevent moisture from evaporating too quickly.

Your local DIY store will supply suitable coverings such as:

Polyethylene sheeting (at least 4mm thick)

Concrete curing insulating blanket

Apply covering only after you have wet your concrete thoroughly. Use heavy items such as bricks or rocks to hold the cover in place. Adding moisture is still really important, so make sure you are removing the cover every day to hose down the concrete slab. You will need to do this every day for 7 days. This method is really common when concrete curing floor slabs for new homes, but also upright concrete columns and walls.

DO wait 1 month until painting or staining

Painting or staining your concrete too early will create a negative chemical reaction that will affect the appearance of your concrete slab. Even during the 28 days following concrete curing moisture is still rising to the top. Adding a layer of paint or stain on top of the rising moisture will create pressure beneath it that will cause the paint to peel.

Concrete Curing: Dont’s

As there is a narrow window after you have poured your concrete in which to begin the curing period, you want to make sure you put in the preparation before you began. Double-checking you are prepared with every necessary tool required, and that you and every team member know how to confidently use every tool, will save you time, money and effort, and prevent your concrete installation from turning horrible.

Industrial-grade wheelbarrows

Trowels designed for concrete

Hand Floats and Darby

Bull float and/or hand float

A concrete rake and broom

Protective boots, gloves and other gear.

Do Not Rush To Pour Concrete Without The Proper Site Inspection

Being patient and ensuring your site is prepared correctly will help you achieve an easy professional result.

Preparing your site for concrete involves:

Clearing land to remove any roots that may interfere with your concrete installation in the future and soft topsoil

Levelling the site

What is Type A vent?
What is Type A vent?

Class A pipe is used to vent high-temperature exhaust released from wood, coal, and oil-burning appliances such as fireplaces, stoves, boilers, and...

Read More »
How do I get air circulation in my garage?
How do I get air circulation in my garage?

How To Improve Ventilation In Your Garage Install insulation. ... Open the door! ... Install windows. ... Install some vents. ... Consider a HVAC...

Read More »

Ensure proper drainage is created around the concrete to prevent the concrete from shifting and cracking in the future

Do Not Work Alone

The most important tip to remember when curing concrete is to never work alone. The entire process of pouring concrete is time-sensitive and not doing it properly, from start to finish, will result in wasted time and money. So the more help, the better. Whether it’s using an experienced team on a commercial construction site, or all your mates to help you with your driveway or shed slab. You only have one chance to properly finish your concrete and not having enough people to help you complete it efficiently will result in brittle, lumpy, unlevel concrete that will also be prone to weather damage. all your hard work will be wasted. you

Do Not Pour Concrete In Bad Weather

Avoid beginning your concrete project when the weather is less than ideal. Heavy rain can affect your hard work by washing out some of the cement from the mix. Which means the strength of the concrete will be affected. It’s important to note that curing concrete in cold weather poses the risk of your concrete’s surface drying out too fast. The entire concrete curing period takes around 1 month to complete. The time you should begin curing your concrete and which method you should use will depend on your specific situation. Speaking to a professional will ensure you are fully prepared for your DIY project. As curing concrete is a time-sensitive job requiring accuracy and precision we do recommend hiring a professional for the best results. Diamond Cut Concrete have trusted professionals with years of experience delivering high-quality and efficient concrete curing. Send Diamond Cut Concrete an enquiry form here.

What is a poorly ventilated room?
What is a poorly ventilated room?

As part of your legal duty to provide sufficient fresh air, your workplace risk assessment should identify poorly ventilated work areas: look for...

Read More »
How many bags of concrete do I need for a 12x12 slab?
How many bags of concrete do I need for a 12x12 slab?

Regarding this, “how many bags of concrete do I need for a 12×12 slab?”, at 4 inches thick, generally you will need approximately either 104 bags...

Read More »
Are shed plans easy to follow?
Are shed plans easy to follow?

These are! They guide you every step of the way to complete your dream shed.

Learn More »
Why is basement not included in square footage?
Why is basement not included in square footage?

Basements and usable square footage It's not usable, so don't include it in square footage. To be considered “living area,” a home's rooms must...

Read More »
Are shed plans easy to follow?
Are shed plans easy to follow?

These are! They guide you every step of the way to complete your dream shed.

Learn More »
What business can I run from my shed?
What business can I run from my shed?

Small Businesses You Can Start in Your Backyard Shed Party organiser. If you love dealing with people and organising events, this is a good...

Read More »