DIY Builds
Photo: Pelageia Zelenina
Regarding this, “how much concrete do I need for a 12×12 slab?”, at 4 inches thick, generally you will need approximately 1.76 cubic yards or 47.52 cubic feet or 1.35 m3 (either 104 bags of 60lb or 80 bags of 80lb) of premixed concrete for a 12×12 slab, at 5 inches thick slab, 2.22 cubic yards or 59.90 cubic feet or ...
The main differences Walnut is rated at a 1010 on the Janka Hardness Scale. European Oak is a 1360 on the same scale. This means that Oak is more...
Read More »
What is an attached dwelling? An attached granny flat is built up against the main dwelling and shares a wall. The dwelling has a separate entry...
Read More »How many bags of concrete do I need for a 12×12 slab | how much concrete do I need for a 12×12 slab | how many yards of concrete do I need for a 12×12 slab | how many cubic feet of concrete do I need for a 12×12 slab | How many bags of concrete do I need for a 12×12 slab at 4″ thick | How many bags of concrete do I need for a 12×12 slab at 5″ thick | How many bags of concrete do I need for a 12×12 slab at 6″ thick | how many m3 of concrete do I need for a 12×12 slab | how many rmc truck of concrete do I need for a 12×12 slab. A bag of concrete ready mix made of blended mix of Portland cement, sand gravel and other approved ingredient or admixture, generally, dry ready mix concrete are available in different bag size and weight condition such as 40lb, 60lb bag, 80lb bag, 90lb bag and etc. Regardless of size you need to calculate the volume of concrete in cubic yard or in cubic feet or in cubic meter or in rmc truck before ordering the mixed concrete. Volume is calculated by multiplying length, width and depth of slab. Here you have given a slab of 12 feet in length and 12 feet in wide, what is thickness of slab?, it’s depend on, is this a slab on the ground or it is elevated, rules differ for both, since failure of ground slab would not kill anyone whereas failure of an elevated slab could. Thumb rules involves the safety factor that deciding the thickness of slab, 4 inch thick is generally for ground slab, heavy traffic and heavy load, you should take depth 5 or 6 inch thick and for an elevated slab generally thickness should be 5″ to 6″, and 4 inch thick is also made to use in normal conditions. Generally standard thickness of slab is 4 inch thick in normal conditions, if 12×12 slab have heavy traffic and heavy load, you should take depth 5 or 6 inch thick. In this article we have to calculate required quantity of concrete in cubic yard & in cubic feet and cubic meter for a 12×12 (144 sq ft) slab at 4 inch, 5 inch or 6 inch thick. Weight of Ready mix concrete in dry condition is about 133 lbs per cubic foot, 3600 lbs per cubic yard, or approximately equal as 2136 kg per cubic meter. The weight of concrete is determined by its density, which can vary based on the amount of aggregate, water, and air in the mix. In United States, based on Imperial and US customary measurement system, 1 cubic yard is unit of measurement of volume represented by 3 feet long by 3 feet wide by 3 feet depth (3’×3’×3′ = 27 cubic feet), so 1 cubic yard is equal to 27 cubic feet.
Pour 2 cups of water and 1 teaspoon of baking soda into a spray bottle and shake well. Spray the moldy area with the baking soda mixture and use a...
Read More »
Outhouses/Latrines North Carolina is one of the few states where outhouses (called privies) are legal. The law establishes rules about how pit...
Read More »To determine the how much concrete do I need for a 12×12 slab & how many bags of concrete do I need for this, you can solve in following steps:- Step 1 :- calculate the volume in cubic feet:- you have given 12×12 slab (length × width), consider it is 4 inch thick, 4 inch = 0.33 feet, to determine the volume of slab, you need to multiply all dimensions, such that = 12′×12′× 0.33′ = 47.52 cubic foot, at 5 inch thick, volume of slab is 12′×12′× 0.416 = 59.90 cubic foot and at 6 inch thick, volume of slab is 12′×11′× 0.5 = 72 cubic foot. Step 2 :- converting cubic feet into cubic yard:- now converting into cubic yard, you should divide it by 27, so volume of concrete you needed for 12×12 slab at 4 inch thick in cubic yard = 47.52/27 = 1.76 cubic yards, at 5 inch thick = 59.90/27 = 2.22 cubic yards & at at 6 inch thick = 72/27 = 2.66 cubic yards. Step 3:- add 10% extra which would be wastage during mixing and pouring. Step 4:- to determine how many bags of concrete you will need, divide the total cubic yards needed by the yields, as you know premixed bag of concrete available in 40lb, 60lb & 80lb. 40lb bag of concrete yields about 0.011 cubic yards, 60lb bag of concrete yields about 0.017 cubic yards and 80lb bag of concrete yields about 0.022 cubic yards. Number of bags of concrete for a 12×12 slab at 4 inch thick To determine how many bags of concrete you will need, divide the total cubic yards needed by the yields, at 4 inch thick, for a 12×12 slab you will need 1.76 yards of concrete, so number of 80lb bag of concrete = 1.76 ÷ 0.022 = 80 bags, No. of 60lb bag = 1.76 ÷ 0.017 = 104 bags & No. of 40lb bag = 1.76 ÷ 0.011 = 160 bags. Number of bags of concrete for a 12×12 slab at 5 inch thick To determine how many bags of concrete you will need, divide the total cubic yards needed by the yields, at 5 inch thick, for a 12×12 slab you will need 2.22 yards of concrete, so number of 80lb bag of concrete = 2.22 ÷ 0.022 = 100 bags, No. of 60lb bag = 2.22 ÷ 0.017 = 131 bags and No. of 40lb bag = 2.22 ÷ 0.011 = 202 bags. Number of bags of concrete for a 12×12 slab at 6 inch thick To determine how many bags of concrete you will need, divide the total cubic yards needed by the yields, at 6 inch thick, for a 12×12 slab you will need 2.66 yards of concrete, so number of 80lb bag of concrete = 2.66 ÷ 0.022 = 121 bags, No. of 60lb bag = 2.66 ÷ 0.017 = 157 bags and No. of 40lb bag = 2.66 ÷ 0.011 = 242 bags. Regarding this, “how many bags of concrete do I need for a 12×12 slab?”, at 4 inches thick, generally you will need approximately either 104 bags of 60lb or 80 bags of 80lb of premixed concrete for a 12×12 slab, at 5 inches thick slab, either 131 bags of 60lb or 100 bags of 80lb premixed concrete are required, while at 6 inches thick slab, either 157 bags of 60lb or 121 bags of 80lb premixed concrete is necessary.
The average run-in shed is about 12 to 14 feet deep, with about 12 running feet for every 1-2 horses. Basically that's the size of a standard stall...
Read More »
The cost to install 30 year architectural shingles is usually about $350 to $500 per square. 50 year architectural shingles are even stronger, and...
Read More »
These are! They guide you every step of the way to complete your dream shed.
Learn More »Regarding this, “how many yards of concrete do I need for a 12×12 slab?, its depend on thickness of slab, assuming at 4 inches slab, generally you will need 1.76 cubic yards of premixed concrete for a 12×12 slab, at 5 inches thick slab, 2.22 cubic yards of premixed concrete are required, while at 6 inches thick slab, 2.66 cubic yards of premixed concrete is necessary. How many cubic feet of concrete do I need for a 12×12 slab Regarding this, “how many cubic feet of concrete do I need for a 12×12 slab?, its depend on thickness of slab, assuming at 4 inches slab, generally you will need 47.52 cubic feet of premixed concrete for a 12×12 slab, at 5 inches thick slab, 59.90 cubic feet of premixed concrete are required, while at 6 inches thick slab, 72 cubic feet of premixed concrete is necessary.
Buildings that can be erected without planning (subject to planning regs) are; non-habitable garden houses – max 25 sq meters (270 sq ft) and...
Read More »
two metres How close a shed can be to a fence: what UK law says. According to UK shed regulations, you do not need to seek planning permission if...
Read More »
Garages and parking spaces are in higher demand than ever before, so having – or adding – one attached to your property can significantly increase...
Read More »
What is another word for woodworking? woodwork carpentry woodcraft joinery turning cabinetmaking handiwork carving scrollwork furniture making
Read More »