DIY Builds
Photo by Yuliya Kosolapova Pexels Logo Photo: Yuliya Kosolapova

Is it OK to run Romex in conduit?

No, you can not run your Romex wiring in conduits. What you're looking at in the code book is referring to THHN and other wiring, that while insulated with a single coat is not insulated with a second covering and bound to 2 or 3 other wires. Power produces heat and heat is the main problem here.

How much land do you need to build a house?
How much land do you need to build a house?

So how much land does your dream home require? Typically, a four-bedroom home can be built on a tenth of an acre, but if you want plenty of outdoor...

Read More »
How do you add a floor to a shed?
How do you add a floor to a shed?

How To Build a Shed Floor [Step-by-Step Guide] Measure and cut rim joist and floor joist boards from 2×6 treated lumber. Set rim joists on shed...

Read More »
Are shed plans easy to follow?
Are shed plans easy to follow?

These are! They guide you every step of the way to complete your dream shed.

Learn More »

In addition to Tester101's excellent answer on when NM-B can be run through conduit, there is a section in the NEC which indirectly prohibits running NM-B through conduit in specific scenarios: From the 2014 NEC: 312.5 Cabinets, Cutout Boxes, and Meter Socket Enclosures. Conductors entering enclosures within the scope of this article shall be protected from abrasion and shall comply with 312.5(A) through (C). (C) Cables. Where cable is used, each cable shall be secured to the cabinet, cutout box, or meter socket enclosure. Exception: Cables with entirely nonmetallic sheaths shall be permitted to enter the top of a surface-mounted enclosure through one or more nonflexible raceways not less than 450 mm (18 in.) and not more than 3.0 m (10 ft) in length, provided all of the following conditions are met: (a) Each cable is fastened within 300 mm (12 in.), measured along the sheath, of the outer end of the raceway (b) The raceway extends directly above the enclosure and does not penetrate a structural ceiling. (c) A fitting is provided on each end of the raceway to protect the cable(s) from abrasion and the fittings remain accessible after installation. (d) The raceway is sealed or plugged at the outer end using approved means so as to prevent access to the enclosure through the raceway. (e) The cable sheath is continuous through the raceway and extends into the enclosure beyond the fitting not less than 6 mm (1⁄4 in.). (f) The raceway is fastened at its outer end and at other points in accordance with the applicable article. (g) Where installed as conduit or tubing, the cable fill does not exceed the amount that would be permitted for complete conduit or tubing systems by Table 1 of Chapter 9 of this Code and all applicable notes thereto. Informational Note: See Table 1 in Chapter 9, including Note 9, for allowable cable fill in circular raceways. See 310.15(B)(3)(a) for required ampacity reductions for multiple cables installed in a common raceway. The fittings used with NM cable to enter a breaker panel also secure the cable to the panel. When conduit is used, I am not aware of another approved method to secure the cable to the breaker panel as required for conduit runs longer than 10 ft. So practically speaking, you cannot have an entire run of NM-B (or any other non-metallic sheathed cable assembly) enclosed in conduit from a breaker panel because it then limits you to a maximum length of 10ft from a surface-mounted cabinet, cutout box, or meter socket enclosure (including breaker panels/boxes in their definitions). The only direction that NM-B can exit the panel in conduit is out of the top of the panel. The conduit for runs attached directly to the surface-mounted panels also have to be a nonflexible conduit per this clause as well. I believe flexible conduit is out of the picture because it offers no protection from physical damage anyways and that is the primary practical reason to run NM-B in conduit, so you might as well be directly attaching the cable to the breaker panel. This clause also implies that runs of NM-B fully enclosed in conduit attached to a recessed-mount panel are prohibited. I believe this is the same reason that non-flexible conduit is not specified because NM-B should be protected from damage by the wall covering anyway for a recess-mount panel and there is no longer need for non-flexible raceways to protect the cable.

What do I lay before gravel?
What do I lay before gravel?

Step 1: Dig out the Path's Shape. Step 1 Kolin Smith. ... Step 2: Form the Trench. ... Step 3: Add Crushed Stone. ... Step 4: Compact the Stone...

Read More »
Can wood be too old to burn in a fireplace?
Can wood be too old to burn in a fireplace?

As long as your wood is seasoning properly and you don't need to burn it right away, there's no harm in waiting two, three or even four years....

Read More »
Are shed plans easy to follow?
Are shed plans easy to follow?

These are! They guide you every step of the way to complete your dream shed.

Learn More »

Do you need planning permission to convert a garage into a granny flat?

Planning permission is not usually required, providing the work is internal and does not involve enlarging the building. If your intention is to convert a garage into a separate house (regardless of who will occupy it), then planning permission may be required no matter what work is involved.

Planning permission is not usually required, providing the work is internal and does not involve enlarging the building. If your intention is to convert a garage into a separate house (regardless of who will occupy it), then planning permission may be required no matter what work is involved. We advise that you discuss such proposals with your Local Planning Authority to ensure that any work you do is lawful and correctly permissioned.

Find your Local Planning Authority ( https://www.planningportal.co.uk/find-your-local-planning-authority )

Find your Local Planning Authority

Sometimes permitted development rights have been removed from some properties with regard to garage conversions and therefore you should contact your local planning authority before proceeding, particularly if you live on a new housing development or in a conservation area. Where work is proposed to a listed building, listed building consent may be required. Please note: The permitted development allowances described here apply to houses and not to:

Flats and maisonettes (view our guidance on flats and maisonettes )

Converted houses or houses created through the ‘permitted development’ rights for: ‘Changes of use’ (Schedule 2, Part 3, Classes G; M; MA; N; P; PA and Q) (as detailed in our change of use section ) ‘New Dwellinghouses’ (Schedule 2, Part 20)

Other buildings

Areas where there may be a planning condition, Article 4 Direction or other restriction that limits permitted development rights. Build Aviator's estimating service can help you plan your project by providing an accurate cost of the proposed changes. Find out more . A planning consultant may help with the smooth running of your garage conversion project. To find an accurate consultancy quote, explore Studio Charrette's calculators .

What will a 5x5 storage unit hold?
What will a 5x5 storage unit hold?

Typically, a 5x5 storage unit can hold: Twin or full size mattress. Dresser. Seasonal home décor. Pool accessories and gardening equipment....

Read More »
Do I need ice and water shield on a shed?
Do I need ice and water shield on a shed?

As ice melts and the water freezes in a continual cycle, the water will creep up the roof and underneath the shingles. This is why it's important...

Read More »
Are shed plans easy to follow?
Are shed plans easy to follow?

These are! They guide you every step of the way to complete your dream shed.

Learn More »
Can you use pallets as a foundation for a shed?
Can you use pallets as a foundation for a shed?

Wooden pallets can be a great choice as a shed foundation because they have a high load capacity. Each pallet can withstand an average of 3,000...

Read More »
Can I build my own shed?
Can I build my own shed?

Yes, with the right plans you can build your dream shed.

Learn More »
How much does it cost to create a studio?
How much does it cost to create a studio?

It costs anywhere from $30,000 to several million dollars to build a professional recording studio. A small, bare-bones studio with limited...

Read More »