DIY Builds
Photo by Pixabay Pexels Logo Photo: Pixabay

Should you spray water on new concrete?

Properly curing your concrete improves strength, durability, water tightness, and resistance for many years. The first 7 days after installation you should spray the slab with water 5-10 times per day, or as often as possible. Once the concrete is poured the curing process begins immediately.

Is it a good idea to build a home in 2022?
Is it a good idea to build a home in 2022?

Yes 2022 can still be a good time to build your custom forever home, despite rising costs and interest rates. Building your custom home is an...

Read More »
How do you keep a shed above freezing?
How do you keep a shed above freezing?

How to Heat a Shed Without Electricity Make Sure It's Well Insulated. Because we don't live in them, most sheds don't get very well insulated. ......

Read More »
These are the Best Shed Plans!
These are the Best Shed Plans!

Comprehensive and Intuitive to follow. Build That Shed!

Learn More »

WHAT IS THE BEST WAY TO CURE MY NEW CONCRETE SLAB?

To get the strongest finish out of your new concrete slab for years to come we suggest taking the time to properly cure your new slab for at least 7 days after installation (28 days is ideal). Curing is the process of controlling the rate and extent of moisture loss from concrete during cement hydration. Curing plays an important role in strength development and durability of concrete. This is done by continuously wetting the exposed surface thereby preventing the loss of moisture from it. If water evaporates too quickly, it will weaken the finished product with stresses and cracking. To put it simply, the goal is to keep the concrete saturated during the first 28 days. The first 7 days after installation you should spray the slab with water 5-10 times per day, or as often as possible. Once the concrete is poured the curing process begins immediately. To protect your new slab and ensure an exceptional finished product you should wait 24 hours for foot traffic (including pets), 10 days to drive light vehicles or add furniture, and 28 days for heavy pick-up trucks and RVs. After 28 days the concrete is cured and you will have a strong and stable slab. After this point you can paint or stain your concrete if you’d like. Properly curing your concrete improves strength, durability, water tightness, and resistance for many years. To get the strongest finish out of your new concrete slab for years to come we suggest taking the time to properly cure your new slab for at least 7 days after installation (28 days is ideal). Curing is the process of controlling the rate and extent of moisture loss from concrete during cement hydration. Curing plays an important role in strength development and durability of concrete. This is done by continuously wetting the exposed surface thereby preventing the loss of moisture from it. If water evaporates too quickly, it will weaken the finished product with stresses and cracking. To put it simply, the goal is to keep the concrete saturated during the first 28 days.
How far must a shed be from property line UK?
How far must a shed be from property line UK?

To ensure you have enough space to treat the outer wall of your shed, we recommend leaving at least 18 inches (approx. 46 centimetres) between the...

Read More »
What's the average cost for barn doors?
What's the average cost for barn doors?

Wood barn doors cost an average of $1,850, or between $650 and $3,050. Wooden barn doors have a highly prized rustic style, making them the most...

Read More »
These are the Best Shed Plans!
These are the Best Shed Plans!

Comprehensive and Intuitive to follow. Build That Shed!

Learn More »

What goes between concrete and wood?

Anyplace where wood meets the ground or concrete, the lumber must be pressure treated. For additional moisture protection, a gasket or strip of closed-cell foam can be installed between the concrete foundation and the sill plate.

Sole plates, or sill plates, are the first pieces of framing lumber placed in home construction. These plates must be made of pressure treated lumber since concrete has a tendency to wick moisture from the ground. Anyplace where wood meets the ground or concrete, the lumber must be pressure treated. For additional moisture protection, a gasket or strip of closed-cell foam can be installed between the concrete foundation and the sill plate. Some moisture barriers for this application combine a foam strip with a waterproofing membrane that covers the bottom of the plate as well as the joint between the foundation and the exterior of the wall assembly.

How do you heat an uninsulated shed?
How do you heat an uninsulated shed?

Here are 5 ways to heat an uninsulated shed: Install transparent sheeting on the roof. Place a space heater in the shed. Use a portable electric...

Read More »
How many solar panels do I need to power a greenhouse?
How many solar panels do I need to power a greenhouse?

So to charge one battery of 400 AH, the panel rating needed is 100*12 = 1200 Watts. For 3 batteries, you'll require 3600 Watts rating PV solar...

Read More »
What can I use instead of an anchor?
What can I use instead of an anchor?

The best way to hang things without a wall anchor is by securing the item to a stud. This can be as simple as driving a screw straight into the...

Read More »
Are shed plans easy to follow?
Are shed plans easy to follow?

These are! They guide you every step of the way to complete your dream shed.

Learn More »
Does a shed need a gravel base?
Does a shed need a gravel base?

But the main reason I recommend a gravel foundation is to protect your shed from water damage. If you have a concrete foundation, water will rest...

Read More »