DIY Builds
Photo: Dids
Concrete is made from cement, sand, gravel and water. In making concrete strong, these ingredients should usually be mixed in a ratio of 1:2:3:0.5 to achieve maximum strength. That is 1 part cement, 2 parts sand, 3 parts gravel, and 0.5 part water.
Black Roses, Rainbow Roses and Blue Roses are created by florists. Black Roses, Rainbow Roses and Blue Roses can not produced in nature, they were...
Read More »
horticulture horticulture, the branch of plant agriculture dealing with garden crops, generally fruits, vegetables, and ornamental plants.
Read More »
Building a garage by yourself is a serious project but can be done with enough motivation, planning, and knowledge. By taking on the project...
Read More »
To do this is very easy. Take your rolls of insulation and tack it to the pre-existing wall. Next, use plasterboard and screw it to the beams of...
Read More »The trough is approximately 1.2 m wide by 2 m long (4 ft. x 6 ft.) and 30 cm (12 inches) deep. Clean the trough after each use before the concrete sets, or it will become difficult to use and heavy to move. It takes time for concrete to cure. After a week concrete has gained most of its strength but it takes about a month to cure to full strength. Therefore, it is very important to let the concrete harden for at least a week before doing anything that will bump or move the pump base. If work is done on the pump before the concrete hardens, then the bond between the concrete and the metal will be weakened. This might not show up right away, but after time the base can begin to separate from the concrete. This is a serious problem because it allows contaminated surface water to seep directly into the well. When installing or repairing a hand pump, NEVER leave a well casing open and unattended! Children, and even some adults, may drop rocks down it to hear the interesting sound the rocks make as they fall. In this way the well casing can be quickly filled with rocks which will destroy the well. Therefore, whenever the well is left unattended before the pump installation has been finished, secure the opening in the pump base. Bolting a plate where the pump head will be attached is an effective method.
If there are obstructions above the joists, such as with a truss roof, it may be easiest to put batt insulation into the joist spaces and then use...
Read More »
Since metal buildings do not have vapor barriers, you will need to choose blanket insulation with a laminated facing. Jan 7, 2021
Read More »
Building a deck is a practical, reliable, and cost-effective way to increase your home value. Research shows that a homeowner can recoup over 75%...
Read More »
Prices vary by region and typically range from $50 to greater than $200 per square foot depending on grade (base, mid-grade, premium, elite) and...
Read More »
For a typical concrete mix, you can start watering after about 12 hours. For fast-dry concrete like quikrete, which is designed to dry much...
Read More »
Let us look at a few simple tips on how you can convert your old shed into a garden greenhouse. Replace The Shed Windows With Clear Acrylic Sheets....
Read More »