Stud spacing can also affect cost savings. In one study of a 2,910-square foot home, switching from 2x4 16-inch on-center framing to 2x6 24-inch on-center framing reduced board feet of lumber by 1,634 feet and cut costs by $171.
There are several things to keep in mind in order to adequately turn your backyard into a proper sleep oasis: Being bug-protected. Outdoor...
Read More »
You may find that vapour barriers are often not required in warmer climates. And, if installed in the wrong climate or on the wrong side of...
Read More »
Additionally, if temperatures reach below 40 °F (but not freezing) during set time, concrete will take much longer to reach required strength....
Read More »
If the shed is on skids or has a floor, then you can secure it by just staking it down with rope. If it doesn't have a floor or skids, then you...
Read More »
Stud spacing can also affect cost savings. In one study of a 2,910-square foot home, switching from 2x4 16-inch on-center framing to 2x6 24-inch on-center framing reduced board feet of lumber by 1,634 feet and cut costs by $171. When other advanced framing measures were added, like switching to single top plates, 24-inch spacing of interior walls, and open headers, lumber costs were reduced $1,117 (Baczek, Yost, and Finegan 2002). Framing on a two-foot also saves money by reducing material waste. Most sheet goods (plywood, OSB, foam insulation) come in 4x8-foot sheets. When the entire home is designed on a 2-foot grid from roof rafters to wall framing to floor joists, sheet good and lumber waste are greatly reduced. Reducing the number of studs in the walls by one-third also reduces labor costs in terms of the time it takes to handle, cut, install, drill through, and attach to studs. Based on numerous field experiments, Building Science Corporation estimates savings of up to $1,000 per home in materials and labor are possible for production builders who use a combination of advanced framing techniques (Lstiburek and Grin 2010). Advanced framing techniques should be specified in the framer’s contract. Detailed framing elevations should be prepared after confirming that these advanced framing techniques are permitted by code in the local jurisdiction. There is a cost associated with redrawing existing floor plans or providing framing details for new plans, but the cost per home is minimal if the plan will be used several times. Also, cost savings will be realized because the details will help gain building official approval, improve accuracy for materials purchasing, clarify instructions for the lead framer, assist in training subs, and greatly improve the chances that the specified measure will actually be implemented (Baczek, Yost, and Finegan 2002).
Dark colors absorb heat, causing an overall increase in temperature. If your shed is a dark color, give it a lighter look. The light colors help...
Read More »
In most cases, a shouse is more affordable than a traditional house. The following will be considered when the cost of your shouse is determined....
Read More »Figure 1. Traditional framing of stud-framed walls with 2x4 studs spaced 16-inches on-center uses more wood than necessary and limits the amount of insulation that can be installed. Advanced framing uses as 2x6 24-inch on-center wall framing, single top plates, and no more studs than are structurally needed, providing a dimensionally thicker wall with more space for insulation (Source: Courtesy of PNNL). Figure 2. This house is being built with advanced framing techniques including 2x6 24-inch on-center wall framing, single top plates, open headers over windows on non-load-bearing walls, and minimal studs around windows (Source: Building Science Corporation 2010).
The short answer is yes. 2x4s can work for deck joists. However, they aren't ideal for spanning long distances without bending or breaking, so you...
Read More »
So if your stone foundation is 100 years old, don't worry: with a little maintenance, it will easily last another 100 years, and beyond!
Read More »
Underground piping shall be buried not less than 18 inches below the surface of the ground unless otherwise protected. All underground piping shall...
Read More »
Using a membrane underneath you gravel driveway or path will prevent weeds whilst allowing natural elements to permeate through to the soil...
Read More »