What is the minimum thickness for a concrete driveway?

4 inches Placing concrete at the proper thickness Place concrete at a minimum thickness of 4 inches. Increasing the thickness from 4 inches to 5 inches will add approximately 20% to your concrete cost, but will also boost your driveway's load-carrying capacity nearly 50% , according to the Tennessee Concrete Association.

What square footage can you build without planning permission?
What square footage can you build without planning permission?

Buildings that can be erected without planning (subject to planning regs) are; non-habitable garden houses – max 25 sq meters (270 sq ft) and...

Read More »
Can you use chicken wire to reinforce concrete?
Can you use chicken wire to reinforce concrete?

Chicken wire or wire mesh can be safely used as a reinforcement in concrete when the concrete is not used in structural or high-weight areas. The...

Read More »
Can I build my own shed?
Can I build my own shed?

Yes, with the right plans you can build your dream shed.

Learn More »

Concrete Driveway Thickness & Construction Basics Find out how thick your driveway should be, what the proper rebar spacing is and more Updated April 7, 2020

Starburst Concrete Design

in Yorktown Heights, NY

To ensure that your concrete driveway will look good for many years to come, there are important specifications your contractor should follow during installation. How well your driveway looks and performs long-term is largely related to the quality of workmanship and materials that go into it. To help ensure a problem-free driveway, use the following list for information about proper construction.

Placing concrete at the proper thickness

Thickness is the major factor (even more than the strength of the concrete) in determining a driveway's structural capacity. Place concrete at a minimum thickness of 4 inches. Increasing the thickness from 4 inches to 5 inches will add approximately 20% to your concrete cost, but will also boost your driveway's load-carrying capacity nearly 50% , according to the Tennessee Concrete Association. Also consider thickening the edges of the driveway by 1 or 2 inches to provide additional structural support in the area most likely to be subject to heavy loading. The thickened sections should extend in from the slab edge 4 to 8 inches. Your local soil conditions and weather patterns may also require a thicker driveway slab. Contact a local driveway contractor for an expert recommendation.

Rebar & wire mesh reinforcement

Using steel reinforcement will provide additional structural capacity for your driveway and is especially important if the slab will be exposed to heavy traffic. Reinforcement won't prevent cracks, but it will help hold them together if they do occur. Concrete reinforcement can be either wire mesh or ½-inch (#4) steel rebar. Use wire mesh for driveways that are 4 to 5 inches thick, and rebar for those that are 5 inches or more. Place rebar in a grid pattern with a spacing between bars of approximately 12 inches. In either case, blocks should be used under the reinforcement to keep centered within the concrete. Synthetic fibers have also proven to be beneficial in driveways as a way to reduce shrinkage cracks. Fibers will not provide structural reinforcement, however. (See Using Fibers for Secondary Reinforcement.)

A properly prepared subgrade

How deep should a 16 foot post be in the ground?
How deep should a 16 foot post be in the ground?

In general, holes should be at least 3 feet deep for posts that extend 8 feet or more above ground level. Posts that extend 6 feet above ground...

Read More »
What does a custom woodworker do?
What does a custom woodworker do?

They make a variety of products such as cabinets, furniture, toys, instruments, and other custom work clients may request. They use a variety of...

Read More »

Uniformity, in both soil composition and compaction, is the key to a good subgrade-one that will provide adequate support, ensure an even slab thickness, and prevent slab settlement and structural cracking. Soft spots should be removed and replaced with good material, such as gravel or crushed rock. Many western states have expansive soils. In these conditions, 2 to 8 inches of crushed rock should be used as subgrade material, depending on the degree of expansiveness. If you are unsure about the soil characteristics in your area, consult a soils engineer. Don't allow the concrete to be placed on bone-dry subgrade, advises the Tennessee Concrete Association. Spraying the subgrade first to dampen it will prevent it from wicking water from the fresh concrete. Vibratory plate compactors and rammers are the most common machines used for subgrade compaction of residential driveways. Click here to read more about subgrades and subbases for concrete slabs.

The correct concrete mix

Mix design will impact the performance and longevity of a concrete driveway. Read more about concrete driveway mix design to find out exactly what to ask for.

Driveway control joints can be incorporated into a decorative pattern.

Correctly placed joints

To help prevent random cracking, control joints should be placed at a maximum spacing of 10 feet for a 4-inch-thick driveway slab. While random cracks are generally not a structural problem and will not reduce the service life of the driveway, they can be an eyesore. Also avoid joint patterns that produce rectangular or triangular sections. The depth of control joints is also critical. Your concrete installer should hand tool or sawcut them to a depth equaling one-fourth the slab thickness (or 1 inch for a 4-inch slab). In addition to control joints, an isolation joint should be installed where the driveway meets a sidewalk, garage floor slab, and other existing pavements. Ask your contractor to provide a jointing plan as part of his written proposal.

Proper finishing

The biggest mistakes that occur during the finishing of concrete driveways are overworking the surface and performing finishing operations while bleedwater is present.

Finishing is generally a three-step process. Your contractor should:

Level or strike off the concrete with a screed to achieve a uniform surface.

How do you layout a small woodshop?
How do you layout a small woodshop?

12 Shop Layout Tips Think About Your Workflow. ... Group Tools Sensibly. ... Store Tools Near the Workbench. ... Put Your Bench Near a Window. ......

Read More »
How long can 30 lb felt be exposed?
How long can 30 lb felt be exposed?

How long can 30 lb felt be exposed? You can let the 30lb felt be exposed for about one to two weeks. Although the 30lb felt is thicker, stronger,...

Read More »

Float the concrete with a wood or magnesium bullfloat before bleedwater accumulates.

Apply a simple broom finish to improve traction-unless plans call for stamping the driveway or applying another type of decorative textured finish (see Making Concrete Slip Resistant). Final finishing with a steel trowel is unnecessary and can actually do more harm than good by sealing the concrete surface prematurely and preventing the evaporation of bleedwater.

Proper drainage

To eliminate standing water on your driveway, it should be sloped toward the street and away from existing structures (such as your house and garage) a minimum of 1/8 inch per foot, recommends the Portland Cement Association. If proper drainage is prevented because the concrete slab is wedged between two structures, you may need to install a drain that will collect the water at a low point in the concrete and divert it away.

Proper curing techniques

Cure the concrete as soon as finishing is completed. Curing of the concrete is the final step of the process, and one of the most important. Unfortunately, it's also one of the most neglected. In extreme cases, failure to cure the concrete immediately after final finishing can result in strength reductions of up to 50% by reducing the concrete's resistance to the effects of weather and increasing the possibility of surface defects.

Tip: Let your concrete cure for at least a week before driving on it. Learn more in How Long Before You Can Drive on New concrete?

Methods of curing include covering the concrete with plastic sheets or wet curing blankets, continuous sprinkling, and application of a liquid membrane-forming curing compound. For slabs that are to be acid stained, wet curing is the best approach, since a curing compound would have to be completely removed to allow the acid stain to penetrate. The most common way to cure plain or integrally colored concrete, though, is to use a liquid curing compound. Read more about why curing concrete is important and how it's done.

Related Information:Resurfacing old concrete driveways

Why you should buy a house?
Why you should buy a house?

The pride of ownership, home value appreciation, mortgage interest deductions, and potential property tax deductions are a few of the best reasons....

Read More »
How do you landscape around a shed?
How do you landscape around a shed?

5 Creative Landscaping Ideas For Sheds Create a beautiful walkway to your shed. The first thing that you can do is create a lovely-looking walkway...

Read More »
Can I build my own shed?
Can I build my own shed?

Yes, with the right plans you can build your dream shed.

Learn More »
Can you use PVC pipe as conduit?
Can you use PVC pipe as conduit?

This means that PVC pipe and PVC conduit cannot be used interchangeably. Because plumbing piping systems must be able to withstand water pressure...

Read More »
Are shed plans easy to follow?
Are shed plans easy to follow?

These are! They guide you every step of the way to complete your dream shed.

Learn More »
Why do clothes go yellow in storage?
Why do clothes go yellow in storage?

Some oil, grime, dirt, and bodily fluids are bound to stay on as they cannot be fully rinsed off with water or a weak detergent solution. The dirt...

Read More »