DIY Builds
Photo by Julia Volk Pexels Logo Photo: Julia Volk

When pouring concrete on a slope do you start at the top or bottom?

#4. Pour concrete. When concrete truck comes, the driver should pour into lower part of the slope first, and then gradually grow upward. If you have numerous footing depths in your pour, the deepest of these footings should be poured first.

How do I protect my outdoor washer and dryer?
How do I protect my outdoor washer and dryer?

Solution: the best solution is still to place your washer in a shaded place. You can set up a patio canopy/sunshade if shade is not present. To add...

Read More »
How much is a 20x20 deck?
How much is a 20x20 deck?

The average homeowner spends $2,200 to build a 10x10 foot deck, $6,160 to build a 14x20 deck, and $8,800 to build a 20x20 deck. The cost to build a...

Read More »
These are the Best Shed Plans!
These are the Best Shed Plans!

Comprehensive and Intuitive to follow. Build That Shed!

Learn More »

Pouring concrete requires proper skill and experience. Pouring it on slope requires even more skills. The whole procedure is not difficult to learn, but it takes practice to be perfect. Pouring concrete on slope may appear to be daunting task at beginning, but proper preparations make it quite easier. Here are some steps that can help you in your project if you are planning to pour concrete on slope:-

#1.Level Your Pouring Surface

Prepare the ground before pouring concrete in to it. There is need to level the ground from side to side. To maintain the driveway level, you are required to remove the dirt from the ground surface. Check the level of the surface more accurately once your build is form.

#2.Space Your Forms Evenly

Make sure that your pour is of uniform width when your form has been installed and ensure distance between side boards is uniform. Form can be made by driving four 1 inch stakes into ground to mark the corners of your driveway. Stakes should be of equal distance from top to top and side to side.

#3.Order Concrete

Concrete should be of lowest allowable slump. Lower slump refers to consistency of the concrete mix. Concrete mix of lower slump has more chances to stay in place once poured and leveled. Once you know the slump allowance, you can order concrete with this allowable slump level.

#4.Pour concrete

When concrete truck comes, the driver should pour into lower part of the slope first, and then gradually grow upward. If you have numerous footing depths in your pour, the deepest of these footings should be poured first. It ensures that concrete will have minimum chances to run downhill. Use concrete vibrator in the wet concrete to take away voids or bubbles.

#5.Finish Your Concrete

After finishing pour, make use of 2×4 placed across the tops of the two side forms and move it from side to side forms and keep moving it side to side and create level surface. When concrete is partially set up, create a slightly rough surface by brushing it with rigid broom. Following these steps will help you to pour concrete on slope or hilly areas. Maple Concrete Pumping is a specialist in pumping concrete and having 5 years of experience. We are dedicated to provide exceptional services that stand beyond your expectation. We look forward to help you.

Visit Our Website :- www.mapleconcretepumping.ca/

Call Us:- 1-855-448-1200

Can a metal shed sit on grass?
Can a metal shed sit on grass?

No. Many metal sheds don't come with floors, so that would obviously be a disaster! However, metal sheds are also heavy, so even when they have...

Read More »
Should you heat your garage in winter?
Should you heat your garage in winter?

Avoid Harmful Damage. Freezing temperatures are not good for a lot of the things you might be keeping in your garage. Heating your garage will...

Read More »

Which of the following should you not do when reaching for something EMT?

To safely reach for an object, an EMT should keep his back in a locked-in position; avoid twisting; and avoid reaching more than 15 to 20 in front of his body.

You respond to a call at a park where you find a 550-pound patient who has fallen down a slope near a creek. As you and your partner discuss the situation, you decide to call a second unit for lifting assistance. Once the patient is on a stretcher, how would the additional two personnel help in this lift?

A) You place one person on each corner of the stretcher to balance the weight and share in the lifting. B) They would position themselves half way up the slope to take over when you and your partner get fatigued. C) You will place two persons at the foot, one at the head, and the other to act as a safety anchor with a rope. D) You will place two persons at the head of the stretcher, one at the foot, and one to act as a spotter.

Does shed foundation need ventilation?
Does shed foundation need ventilation?

Proper ventilation in a shed is necessary for both your comfort and your safety. If you work with and/or store gasoline and other combustible...

Read More »
Should fence posts be inside or outside?
Should fence posts be inside or outside?

Fence posts should be on the outside of the fence Fence posts that have been placed outside of the fence material will take nearly all of the...

Read More »
Can I build my own shed?
Can I build my own shed?

Yes, with the right plans you can build your dream shed.

Learn More »
Can you add a shower to a shed?
Can you add a shower to a shed?

A shed with bathroom comes in a variety of styles and sizes to suit your needs and budget. It is because it is technically shed (and not separate...

Read More »
What is woodwork good for?
What is woodwork good for?

Woodworking has the double whammy of heart health – it lowers stress while also promoting more movement of your body. This reason is why the hobby...

Read More »